Alagon
Waterproofing
Concrete Restoration
Commercial Painting
Overview
Alagon awarded a restoration project to Coastal, focusing on the 30-year Structural Integrity Reserve Study (SIRS) re-certification (Florida Senate Bill 4-D). The objective was to enhance the safety, appearance, and longevity of the building’s exterior elements by removing deteriorated railings and applying a fresh, durable protective coating.
No items found.
services provided
01.
Waterproofing
02.
Concrete Restoration
03.
Hydraulic Repairs
04.
Commercial Painting
Project Details
Scope of Work:
- Installation of 27,000 linear feet of high-end glass hand rail
- Application of waterproofing system over 16,000 square feet
- Hydraulic repairs to existing seawall structure
- Complete exterior repainting of the building envelope
- Structural concrete restoration and repairs
Outcome:
The project remains on schedule, with completion expected in September 2025. All timelines are being met, and the client is happy with the progress.