Alagon

Waterproofing
Concrete Restoration
Commercial Painting
Overview

Alagon awarded a restoration project to Coastal, focusing on the 30-year Structural Integrity Reserve Study (SIRS) re-certification (Florida Senate Bill 4-D). The objective was to enhance the safety, appearance, and longevity of the building’s exterior elements by removing deteriorated railings and applying a fresh, durable protective coating.

services provided
01.
Waterproofing
02.
Concrete Restoration
03.
Hydraulic Repairs
04.
Commercial Painting

Project Details

Scope of Work:

  • Installation of 27,000 linear feet of high-end glass hand rail
  • Application of waterproofing system over 16,000 square feet
  • Hydraulic repairs to existing seawall structure
  • Complete exterior repainting of the building envelope
  • Structural concrete restoration and repairs

Outcome:
The project remains on schedule, with completion expected in September 2025. All timelines are being met, and the client is happy with the progress.